国产成人欧美一区二区三区一色天_久久成人一区二区_a在线视频_在线一区二区三区_在线视频亚洲_欧美日韩一区二区三区不卡视频

Scan code consultation:
0755-2102 2109
Service
Current location: Home Service MA and KA Certificate
Guidelines for Applying for Changes in the Mark of Coal Safety MA and Coal Safety KA

SINO Testing Services

| 2020-06-22|Return

If the products of the enterprise are within the validity period of the safety mark, but there are changes in the business registration information, production conditions, or product technical documents of the certificate holder, they need to apply to the national agency for a change in the safety mark.






1、 Apply

If the product of the certificate holder needs to be changed within the validity period of the safety mark, an application for change shall be submitted to Zhongnuo Testing. The change content includes changes in the legal representative, residence, registered capital, technical personnel, inspection personnel, production equipment, inspection equipment, and product technical documents of the certificate holder.

2、 Initial review/acceptance

Zhongnuo Testing conducts preliminary review of application materials and accepts those that meet the requirements.

3、 Change assessment

(1) For changes in the business registration information of the holder, those that meet the requirements after review shall be recorded; For those that require further verification through on-site evaluation, after confirming that the changes comply with the relevant management regulations for safety signs, a safety sign certificate will be issued.

(2) If there are changes to the product technical documents, national institutions shall organize the review and evaluation of the changed content, and determine the audit process that should be carried out for the changed product.

4、 Technical review

For those that require technical review, it shall be conducted in accordance with the requirements of the technical review procedure, and the content of the technical review shall generally only focus on the changed parts.

5、 On site evaluation

For those that require on-site evaluation, follow the requirements of the on-site evaluation procedure.

6、 Product Inspection

For those that require inspection, follow the inspection procedure requirements, and the inspection items should only involve the changed parts in principle.

7、 Final review, replacement of safety sign certificate

Zhongnuo Testing will submit relevant reports to national institutions. After receiving the relevant reports, the national institutions will conduct a final review of the changed products. Qualified products will be re filed with technical documents or replaced with safety mark certificates. When replacing the certificates, the certificate number and validity period will remain unchanged.

8、 Choosing Zhongnuo Testing, we can provide the following services:

(1) Develop a work plan based on the actual production, technology, and product situation of the enterprise, and carry out and complete the overall work from product application to certification according to the plan;

(2) Provide institutional certification model references and make suggestions;

(3) The enterprise shall provide corresponding technical materials for application, such as drawings, manuals, and details of supporting parts; We can provide a reference template (for first-time applications);

(4) Collecting, organizing, and submitting application materials, with a one-time qualification;

(5) Provide process information templates such as production process flow diagrams, process cards, assembly cards, and product information templates that meet the requirements of the organization (for first-time applications);

(6) Provide product inspection procedure templates and guide enterprises in preparing factory inspection reports that meet standards;

(7) Maintain communication with the laboratory to ensure timely arrangement of on-site product inspection time and cooperate with the company to complete technical data rectification;

(8) Communicate with national institutions on specific matters such as the time and project of on-site evaluation;

(9) Establish a system document that meets the requirements of the "Guidelines for On site Review of Safety Signs"; Such as coal mine safety requirements, safety standards and quality manuals, procedural documents, management systems, equipment operation procedures, inspection procedures, training plans, test papers, production records, inspection records, maintenance records, and other materials;

(10) On site production guidance, training, review and communication of response skills; On site pre evaluation and improvement of evaluation content;

(11) Review to ensure approval (hardware must meet requirements);

(12) Collaborative enterprise rectification

(13) Assist in evidence collection


 



Related Recommendations
Contact us
0755-2102 2109
Add: 13F, Building C, Kangjia Guangming Technology Center, No. 288 Xingxin Road, Guangming District, Shenzhen
Follow us
Copyright: Shenzhen Zhongnuo Testing Technology Co., Ltd. 粵ICP備18004888號
Service Hotline
18924609560
點擊這里給我發消息 1354407946
點擊這里給我發消息 1354407946
主站蜘蛛池模板: 日本啊啊视频 | 夜夜cao| 亚洲天堂成人在线 | 国产亚洲精品片a77777 | 欧美日韩中文亚洲v在线综合 | 青青操在线| 欧美日韩亚洲一区二区精品 | 波多野结衣 久久 | 美女视频网站黄色 | 美女脱得一干二净 | 免费不卡毛片 | 亚洲精品无码专区在线播放 | 日本高清在线观看视频www | 日本伦理片网站 | 国产精品一页 | 青青影院在线播放免费 | 色综合天天色 | 日本视频免费看 | 日本二区在线观看 | 久久久久免费精品视频 | 欧美八区 | 久久综合丝袜日本网 | 一级aaa级毛片午夜在线播放 | 97人人澡人人爽人人模 | 久久久久久夜精品精品免费啦 | 亚洲欧美日韩一区高清中文字幕 | 韩国三日本三级中文字幕 | 免费中文字幕一级毛片 | 国外成人在线视频 | 韩国a视频 | 欧美国产综合视频 | 欧美一级成人影院免费的 | 久操视频在线观看 | 欧美日韩三级在线观看 | 国产成人99 | 亚洲日本免费 | 特黄aaaaa日本大片免费看 | 国产成人a在一区线观看高清 | 欧美性生大片免费观看 | 日本jizzz | 国产69精品久久久久999小说 |